Path Duration
Path Duration is supported only in the following Blender versions:
3.5 3.6 4.0 4.1 4.2Description
The number of frames that are needed to traverse the path, defining the maximum value for the 'Evaluation Time' setting
How to Find
In Data Type Selection Interface:
- Select Data Type: Curve
In Curve Selection List:
- Filter Menu > Path Duration